The proposed bill would give the Don Orestes Romualdez Electric Cooperative (DORELCO) a 25‑year franchise to build and run electric power distribution lines in 13 towns of Leyte, with rates set by the Energy Regulatory Commission, requirements for local hiring, consumer complaint handling, and penalties for non‑compliance.
Automated summary by BatasWatch. It may miss nuance — read the bill text before citing it.
Printed from CivicSync PH: https://civicsync-ph-gamma.vercel.app/bills/HB00871. Status changes over time; check the link for the latest.
HB00871 · Sources: BetterGov Open Congress, BatasWatch
Similar in what they’d do, filed by any lawmaker.